Testing Process

The steps in the testing process are as follows.
1. Requirement analysisTesting should begin in the requirements phase of the software life cycle (SDLC). The actual requirement should be understand clearly with the help of Requirement Specification documents, Functional Specification documents, Design Specification documents, Use case Documents etc.
During the requirement analysis the following should be considered.-Are the definitions and descriptions of the required capabilities precise? -Is there clear delineation between the system and its environment?-Can the requirements be realized in practice?-Can the requirements be tested effectively?
2. Test PlanningDuring this phase Test Strategy, Test Plan, Test Bed will be created.A test plan is a systematic approach in testing a system or software. The plan should identify:-Which aspects of the system should be tested?-Criteria for success.-The methods and techniques to be used.-Personnel responsible for the testing.-Different Test phase and Test Methodologies-Manual and Automation Testing-Defect Mgmt, Configuration Mgmt, Risk Mgmt. Etc-Evaluation & identification – Test, Defect tracking tools
3. Test Environment SetupDuring this phase the required environment will be setup will be done. The following should also be taken in account.- Network connectivity’s-All the Software/ tools Installation and configuration-Coordination with Vendors and others
4. Test DesignDuring this phase-Test Scenarios will be identified.-Test Cases will be prepared.-Test data and Test scripts prepared.-Test case reviews will be conducted.
5. Test AutomationIn this phase the requirement for the automation will be identified. The tools that are to be used will be identified. Designing framework, scripting, script integration, Review and approval will be undertaken in this phase.
6. Test Execution and Defect Tracking Testers execute the software based on the plans and tests and report any errors found to the development team. In this phase
-Test cases will be executed.-Test Scripts will be tested.-Test Results will be analyzed.-Raised the defects and tracking for its closure.
7. Test Reports Once testing is completed, testers generate metrics and make final reports on their test effort and whether or not the software tested is ready for release.
-Test summary reports will be prepared-Test Metrics and process Improvements made-Build release-Receiving acceptance